Evaluation of performance of scour protection and edge scour development : Offshore Windpark Egmond aan Zee
Author(s) |
T.C. Raaijmakers
Publication type | Report Deltares
In 2006 the first Dutch offshore windpark was installed approximately 10 to 18 kilometres offshore from Egmond aan Zee. This first offshore windpark should contribute to an increase of the use of renewable energy and is therefore designated as a "demonstration project" by the Dutch Ministry of Economic Affairs. Knowledge and experience that is gained in this project will be used in the development of future offshore windparks.