Drilling and installation of monitoring well for ASR pilot in Hau Giang province
Auteur(s) |
A. Steinel
|
A. Oosterhof
|
M. Faneca Sanchez
Publicatie type | Rapport Deltares
The project ASR application for Domestic Fresh Water Supply in the Vietnamese Mekong Delta was made possible by a grant under RVO's Partners for Water program.
In January, the DWRPIS team drilled and installed the monitoring well M1 for the ASR project. The main goal of the drilling was to investigate the position and the characteristics of the target aquifer qp1.